OUR WORKS
Design, manufacture and installation of a 220m2 steel structure and roof, replacing the old roof, maintaining the architectural design and including a 12-meter mezzanine floor, just below the roof.
Maintenance of tanks using climbers, carrying out the procedure of washing, repairing and painting tanks with difficult access.
Structural repair of gates on the upper part of the conveyor belt, including manufacturing of new frames and grids, their installation and repairs in the surrounding area, totaling 100 repaired items where there is heavy equipment traffic. In addition to the adequacy of NR12 in equipment.
Construction of a mini-city, comprising paving, building and painting of 255m2, in addition to the services of revitalization and painting of the surrounding buildings, such as a classroom building of approximately 1,446m², a multi-sport court, side closure and installation of synthetic grass in a children's playground.